PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Low roof storm piping at the 4th floor Facing West.jpg Welding clips at the 1st floor UCIA Lobby Facing South.jpg Block Work at the detention cells Facing West.jpg Core Drilled at Stair -2 2.jpg Installing Stone panel at the 1st floor East Elevation.jpg Installing Stone panels at the East Elevation 1.jpg Installing Stone panels at the East Elevation 2.jpg Laying out block at the 1st floor EMR Room Facing South.jpg Erecting the stone panels at the East Elevation.jpg
Previous pageNext page Installing Stone panel at the 1st floor East Elevation
Installing Stone panel at the 1st floor East Elevation